by Rishabh Rastogi, Sushil Kumar Solanki * , Virendra Kumar Paul
School of Planning and Architecture, New Delhi, 110002, India
* Author to whom correspondence should be addressed.
Journal of Engineering Research and Sciences, Volume 1, Issue 5, Page # 71-78, 2022; DOI: 10.55708/js0105008
Keywords: Supply Chain Challenges, Prefabricated Construction, Relative Impact, Relationship Matrix
Received: 08 February 2022, Accepted: 10 April 2022, Published Online: 12 May 2022
JENRS
AMA Style
Chicago/Turabian Style
IEEE Style
Across various barriers pertaining to prefabricated building construction projects, a major barrier identified by the literature was integration of various components of prefabricated building project supply chain network, including the material and human resource supply chains. The literature suggests a need of exploring this barrier of supply chain integration into its various sub factors/challenges (termed as supply chain challenges) with the perspective of prefabricated building construction supply chains. This research tries to fill this gap by analyzing three cases of existing prefabricated building construction supply chains in Indian context with different configurations, geophysical profiles and project typologies. This study gives an understanding of the relationship among supply chain challenges, the variation in their relative impact on project time and cost (within the supply chain and across the different configurations of supply chains), and the underlying causes of these variations.
This sidebar is currently being updated and may temporarily overlap with the pages.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.